CENTRE
FOR CELLULAR AND MOLECULAR BIOLOGY
(Council
of Scientific & Industrial Research)
Uppal
Road, Hyderabad
Notification
No.3/2012
1) CCMB is inviting on-line
applications for the project positions (as per the annexure to this
notification) in the CZA Project based on genetic polymorphism studies and
assisted reproduction contract basis.
2) Eligible candidates may apply
online on or before20.06.2012.
3) Shortlisted candidates for
attending the interview will be hosted on CCMB website on 22.06.2012 at 6:00
PM.
4) Interviews will be held on
28.06.2012 at LACONES, CCMB Annexure (near to Pillar No.162, PV Narasimha Rao
Expressway, Airport Flyover bridge) Attapur Ring Road, Near BD Office, Chevilla
Division, Hyderguda X Road, Hyderabad and candidates are required to report at
8:00 AM on the date of interview
5) Shortlisted candidates may
appear for interview along with copy of
online application form supported by bio-data and one set of photo copies of
certificates/marks of educational qualification, age, experience, caste
certificate in the prescribed proforma SC/ST/OBC candidates) etc.
6) Shortlisted candidates are
advised to bring all the original certificates in proof of their educational
qualifications and work experience for verification at the time of interview.
7) No TA/DA will be paid for
attending the interview
8) Selected candidates will be
engaged initially for a period of one year and their tenure will be extended on
six monthly basis, till the date of project which coterminates by March 2017
However, the total tenure as Project fellows shall not exceed more than 5 years
The total tenure of five years
shall be calculated as per the period a candidate spent on one project and / or
different projects taken together in CCMB or any other Lab. / Institute of CSIR
and Project RA/SPA/JPA/CA or any other designation of equal status.
9) Contract may be terminated any
time by giving one month notice by either side. The applicants/candidates will
have no claim implicit or explicit for consideration for regularization in
future against any post in CCMB/CSIR.
FOR DETAILS, PLEASE REFER http://www.ccmb.res.in/positions/lacones/docs/Noti_3_2012.pdf
No comments:
Post a Comment